造成混凝土搅拌机闷罐的原因?

来源:http://www.zkhntjbj.com/日期:2020-10-09

概述:  混凝土搅拌机闷罐指的是在生产中搅拌叶轮突然被混凝土卡死而不能滚动。这种情况下,会造成搅拌机的主电机带电停转,如果电器维护部分没
  混凝土搅拌机“闷罐”指的是在生产中搅拌叶轮突然被混凝土卡死而不能滚动。这种情况下,会造成搅拌机的主电机带电停转,如果电器维护部分没有及时进行维护,或许维护时刻等参数设置不合理,那么就有可能形成主电机被焚毁的风险。下面小编就来介绍下混凝土搅拌罐焖罐的原因以及如何防止混凝土搅拌罐粘罐的方法。
  The "closed tank" of concrete mixer refers to that the impeller of concrete mixer is suddenly blocked by concrete and can not roll. In this case, the main motor of the mixer will stop running when it is charged. If the electrical maintenance part is not maintained in time, or the maintenance time and other parameters are set unreasonably, the main motor may be burned. The following small series to introduce the reasons for the concrete mixing tank stewing tank and how to prevent the concrete mixing tank from sticking to the tank.
  一、混凝土搅拌机“闷罐”的原因
  1、 Causes of concrete mixer's "stuffy tank"1、主电机皮带过松,动力传递缺乏。这种情况下,搅拌机内搅拌阻力稍大,就可能被卡住,从而形成闷罐现象。
  1. The belt of main motor is too loose and the power transmission is lack. In this case, if the mixing resistance in the mixer is slightly larger, it may be stuck, thus forming the phenomenon of stuffy tank.
  2、一次性投料过多,比方应该是两盘搅拌量,由于错误动作一次投搅拌机,那么很就可能闷罐了。有时候由于搅拌机开门时间不合理,上盘料卸不洁净也可能形成闷罐。
  2. One time feeding is too much, for example, it should be two plates of mixing volume. Due to the wrong action, the mixer is likely to be blocked. Sometimes, due to the unreasonable opening time of mixer, the unclean unloading of the upper plate may also form a closed tank.
  3、搅拌机内衬板磨损严重,或许搅拌叶磨损严重,形成搅拌叶和搅拌机内衬板间隙过大,或许间隙严重不均匀,也是形成闷罐的多发原因,这种情况下,搅拌叶与搅拌衬板间必然会有较多的坚固粗骨料,搅拌机被卡死,也就不足为怪了。
  3. The inner lining plate of mixer is seriously worn. Perhaps the mixing blade is seriously worn, resulting in the excessive gap between the mixing blade and the inner plate of the mixer, or the gap is seriously uneven, which is also the frequent cause of the formation of the tank. In this case, there must be more solid coarse aggregate between the mixing blade and the mixing lining plate, and it is not surprising that the mixer is stuck.
             混凝土搅拌机
  4、投料的份额不合理,或许次序不对,也有可能闷罐,特别是投料中没有水,会大大添加搅拌阻力。
  4. The feeding proportion is not reasonable, maybe the sequence is wrong, or the tank may be stuffy, especially if there is no water in the feeding, the mixing resistance will be greatly increased.
  5、搅拌罐车“抱大轴”(指的是拌和机主轴粘结许多混凝土),或许其它部位粘结过多的混凝土,也是形成“闷罐”的多发原因。搅拌机里边粘结东西越多,搅拌阻力越大,严重时就形成闷罐。这种情况下,操作手应密切注意搅拌主机的电流数值,电流数值过大,就有可能需求整理一下搅拌机内部了;6、搅拌罐车内混入钢筋棍、铁板等异物,或者搅拌臂折断、电机相间不平衡、电源电压过低一级异常情况也可能形成“闷罐”一般情况下,在一段时间内经常性的闷罐,前三种可能性更大一些。假如搅拌电机电流大,第五种可能性更大。
  5. Mixing tank truck "holding big shaft" (refers to the mixer spindle bonding a lot of concrete), perhaps other parts of the bond too much concrete, is also the cause of the formation of "closed tank". The more things are bonded inside the mixer, the greater the mixing resistance is, and when it is serious, it will form a closed tank. In this case, the operator should pay close attention to the current value of the mixing machine. If the current value is too large, it may be necessary to sort out the mixer interior; 6. The mixing tank truck is mixed with steel bars, iron plates and other foreign matters, or the mixing arm is broken, the motor phase is unbalanced, and the power supply voltage is too low. Generally speaking, in a certain period of time, the "closed tank" may be formed The first three are more likely to be closed. If the stirring motor current is large, the fifth possibility is greater.
  二、防止混凝土搅拌机粘罐的方法
  2、 Methods of preventing concrete mixer from sticking to tank1、在施工现场卸料完毕后,应立即用山东自动上料搅拌车随带的软管冲洗进料斗、出料斗、卸料溜槽等处,粘附在车身各处的污泥及混凝土。在返回搅拌站的途中,应向搅拌筒内注150---200L水以清洗筒壁及叶片粘结的混凝土残渣。
  1. After unloading at the construction site, the inlet hopper, discharge hopper and discharge chute should be flushed with the hose attached to Shandong automatic loading mixer to remove the sludge and concrete adhered to the vehicle body. On the way back to the mixing station, 150-200l water should be injected into the mixing drum to clean the concrete residue bonded by the cylinder wall and blades.
  2、每天工作结束后,司机应负责向山东自动上料搅拌车搅拌筒内注入清水并高速(14—18转/分)旋转5—10分钟,然后将水排去,以保证筒内清洁。用高压水清洗搅拌筒各个部分时,应注意避开仪表及操纵杆等部位。压力水喷嘴与车身油漆表面间的距离不得小于40厘米。
  2. At the end of each day's work, the driver should be responsible for injecting fresh water into the mixing drum of Shandong automatic feeding mixer, rotate it at high speed (14-18 RPM) for 5-10 minutes, and then drain the water to ensure the cleanness of the drum. When cleaning each part of the mixing drum with high pressure water, pay attention to avoid the instrument and control rod. The distance between the pressure water nozzle and the paint surface of the vehicle body shall not be less than 40 cm.
  3、搅拌筒内外积污及残存的混凝土渣块时,以及在机修人员进入筒内进行检修和焊补作业时,需先关闭山东自动上料搅拌车发动机,使搅拌筒完全停止转动。在机修人员进入筒内工作期间,必须保证拌筒内通风良好,空气新鲜,无可然气体及有害灰尘,氧气供应充足。在筒内使用电动工具操作时,操作人员必须有良好的绝缘保护。
  3. When removing the dirt and residual concrete slag inside and outside the mixing drum, and when the machine maintenance personnel enter the cylinder for maintenance and welding repair, it is necessary to shut down the engine of Shandong automatic feeding mixer to stop the mixing drum completely. During the period when the machine maintenance personnel enter the cylinder, they must ensure that the mixing drum is well ventilated, the air is fresh, there is no natural gas and harmful dust, and the oxygen supply is sufficient. When using electric tools in the cylinder, the operator must have good insulation protection.
  4、工作时,不得将手伸入旋转的搅拌筒内,严禁将手伸入主卸料溜槽和加长卸料溜槽的连接部位。
  4. When working, do not put your hand into the rotating mixing drum, and do not put your hand into the connection between the main discharge chute and the extended discharge chute.